top of page

How Much Does a Multi Engine Add On Rating Cost in Tennessee?

30 minutes ago
5 min read
How Much Does a Multi Engine Add On Rating Cost in Tennessee?

If you are a pilot asking what a multi engine add on rating costs, here is the honest short version: it is usually one of the least expensive ratings on paper, because there is no written test and the flying is measured in hours, not weeks. Our accelerated commercial multi engine add on at Smyrna runs $5,500, flown over 5 to 7 days in a Garmin G1000 equipped Diamond DA42. But the real answer to your question is that the airplane you train in and how prepared you show up are what truly move the price, and those two things can swing the total by thousands of dollars.


Let us walk through what you are actually paying for, and where the money goes.


Why is the airplane the biggest factor?


A multi engine rating is almost entirely about airplane time. You are learning to manage two engines, understand what happens when one quits, and fly the airplane safely on the remaining engine. That means the hourly cost of the twin you train in is the single largest line on your bill.


Twins are not all priced alike. A simple older piston twin rents for less per hour than a modern, glass cockpit airplane with advanced engines. We fly the DA42, which burns Jet A through two Continental turbo diesel engines with FADEC single lever control and a coupled autopilot. It is a clean, modern platform to learn in, and we operate two of them at Smyrna Airport so scheduling stays workable.


In a multi engine rating, you are not paying for a classroom. You are paying for time in a twin.

So when you compare quotes from different schools, the first question is not the total price. It is: what airplane, and what does it cost per hour? A low headline number in an expensive twin can end up costing more than a higher headline number in an efficient one.


What does our $5,500 program actually include?


We built the accelerated add on so you know what is in the box before you ever arrive. For $5,500 you get:


  • An online ground course to work through before you come

  • All day ground school on day one, with lunch

  • A half hour simulator assessment

  • 6 hours of dual in the DA42 with a multi engine instructor

  • About 1.5 hours of DA42 time for the checkride

  • A one on one mock oral

  • Printed checklists and a course outline


A $1,000 deposit holds your spot up to three months ahead, and the remaining $4,500 is due when you arrive. The examiner's fee is not included in that price. That fee is paid directly to the examiner, and it is a separate, normal part of any checkride.


What makes the price go up or down?


This is the part most pilots really want to understand. Two students can walk into the same program and leave with different totals. Here is why.


How much extra flying you need


Our program is train to proficiency. That means we fly until you are ready for the checkride, not until a clock runs out. The 6 hours of dual are included, and if you need more time to feel sharp on single engine work, slow flight, or the engine out procedures, extra dual is $635 an hour. That breaks down to $550 for the DA42 and $85 for the instructor.


We will not tell you how many hours you personally will need, because we genuinely do not know you yet, and anyone who promises a number sight unseen is guessing. What we can tell you is that showing up prepared is the best thing you can do for your wallet.


How prepared you arrive


The online ground course exists for a reason. Multi engine flying has its own vocabulary and its own aerodynamics, and the pilots who study the material ahead of time spend their flight hours flying instead of catching up. The oral portion of a checkride rewards the pilot who did the reading.


The cheapest hour is the one you did not have to repeat because you came ready.

Currency and recency


If your instrument skills are rusty or you have not flown much lately, you may need a lesson or two just to knock the dust off before the twin work clicks. That is normal, and it is not a failing. It is just something to be honest with yourself about, because rust costs airplane time.


What do I need before I can start?


A multi engine add on builds on ratings you already hold, so there are prerequisites. For our program you will need:


  • A commercial single engine certificate

  • Instrument current

  • A third class medical or higher

  • Valid ID, and TSA approval if you are not a US citizen

  • Multi engine renter's insurance

  • To be under 300 pounds


On the exact test, endorsement, and currency requirements for the rating itself, confirm the current rules with your instructor and the FAA before you book anything. Regulations and standards change, and the last thing you want is to arrive missing a piece of paper.


How does the week actually flow?


The accelerated format is built so you are not driving back and forth for weeks between lessons. Day one is ground school, start to finish, with lunch included. From there you move into the simulator assessment and into the airplane, flying with your instructor until the maneuvers feel natural and repeatable.


Because our chief flight instructor, Phil Kuitems, is an FAA designated pilot examiner, checkrides are scheduled in house. That keeps the whole process under one roof. We are careful about how we describe that, because no one should ever call a checkride guaranteed or a sure thing. A checkride is an exam, and you earn it. What the in house arrangement does give you is a clean, coordinated schedule instead of chasing an outside examiner's calendar.


Pilots fly in from across the country for this, and we have affordable housing and financing available so the logistics of a week away from home are manageable. We are at 621 Fitzhugh Boulevard in Smyrna, about 25 minutes from Nashville, which makes getting here straightforward whether you drive or fly in.


How should I think about the total cost?


When you are budgeting, add up every piece, not just the program price. For a realistic picture, plan for:


  • The program itself

  • The examiner's fee, paid directly to the examiner

  • Any extra dual, if you choose to fly more to feel ready

  • Travel, lodging, and your renter's insurance


Think of it the way you would a home project. The quoted number covers the planned work. A small contingency for the parts you cannot predict keeps the whole thing calm and stress free. Pilots who budget a little cushion rarely feel pinched, and they fly better for not worrying about it.


A multi engine rating is one of the more rewarding things you will do as a pilot. There is a real moment, usually a day or two in, when managing two engines stops feeling like juggling and starts feeling like flying. If you are weighing it, come talk it through with us. We are happy to walk you through the numbers honestly, and we would enjoy helping you figure out whether now is your time. You can reach us at (615) 323-3123.


 
 
bottom of page